10 Steps of building demolition by Piyamitr group. Read and know everything in one place at once.
10 Steps of building demolition by Piyamitr group. Read and know everything in one place at once.
10 Steps of building demolition by Piyamitr group. Read and know everything in one place at once.
Not so many times in our lives that we would demolish
our houses or our office building. It seems that the construction demolition is
far from us. However, if one day, it has to be done, many people would have
doubt about its process- as the hirer, what do we need to do . Piyamitr group
will collect all the process of building demolition to let you see the big
picture of the construction for your understanding so that once you need to do
it, you will learn from it and the work
will be accomplished successfully.
1.
Call for the appointment When you think about doing home demolition or building
demolition, you should consult the real expert like us. Piyamitr Group Co.Ltd
(more than 20 years of experience), will send the expert to the site for free,
there is no charge. Just call 081 7551229 or if you would like to roughly
evaluate the cost and need the urgent pricing, you can send the photos of the
home, building that you would like to demolish via the Line : joethailand007.
We serve you 24/7.
Do
not feel shy or considerate to consult us because if you mistakenly do it, the
problems may be overwhelmingly unable to be fixed. Customers frequently call us
to evaluate the demolition work, in many cases that we recommend to not do the
demolition at all.
2. Analyze the building
The next step is that the constructor
will survey the site to analyze the building to evaluate the difficulty from
the exterior of the building, for example, which part of the building that need
to be demolished, which direction of the building that will be extended, in
order to plan for how to demolish it, how many crews needed, what tools are
required. This way we can tell the
contractor to explain the details and plan the work together.
3. Look around the area. Besides
analyzing the demolished building, the next step is for the contractor to do
the analysis of the environment nearby the demolished building. For example,
how are the nearby buildings, how many people living around the demolished
site, what are their lifestyle, in order to find the method to prevent the
disturbance to the nearby buildings and people around that area. Most
importantly, it's essential to the safety of everyone. This data will be used
to plan the work. For each demolition, only the building that must be
collapsed, but the relationship and the safety must be strengthened. Everyone
smiles once the job is done.
4. Draft the contract
Once the contractor have
finished the demolition plan, there will
be the presentation of the demolition steps and accident prevention
methods to ensure the safety. There is
the contract draft and the presentation of the process to the hirer to be
informed and read before the approval.
If there's anything missing, we can add and tell each other at once.
5. Find the auspicious
time before the actual demolition. Piyamitr group have concerns in every
detail. We find the auspicious day according the Fengshui in order to find the
date of demolition to ensure the work is done successfully and for the propitiousness of the hirer
6.
Prepare the area on the auspicious date, it is time to start demolition
work, the first thing that the contractor do is to prepare for the area,
enclose the area, provide tools and equipments for the safety. This is very
important.
7. Meet the team before starting the
demolition. The contractor will call for the meeting of the demolition crews to
get the same understanding about the whole picture of the project- where and
how to demolish, what are the concerns
in order to get the work done successfully and most importantly for the safety
of everyone including the team and the people nearby.
8. Actual demolition The actual
demolition will start from removing materials that can be reused first such as
electric wires need to be removed in long continuous strings, doors, windows,
and sanitary wares onto the roof tiles. Therefore, wherever these materials
located in our homes, we can tell the contractor what are they and where are
they in your home to make sure you remove all things that you need, nothing
wasted. Once you got everything you want to keep, the demolition work can start
immediately from the top of the building starting from smashing the floor, the
ceiling until there's the building structure left - the poles and beams.
9.Continue demolishing the
poles and beams. If it is the exterior part near the road or nearby houses, the
contractor will use the wire rope pulling hoist to attach with the pole and
beam to force it to fall down in one direction to ensure the safety of the
demolition crew and people who live nearby.
Once there is only
internal structure left, it is time to start backhoe engine, which come with
the heavy Hydraulic Breaker ready to break through the building in its full
stream starting from the top to bottom of the building. This process is the
process that will generate a lot of concrete dust, which is hazardous to our
lives if we inhale it. In this process, we use dust suppression sprayer fog to prevent the
spreading of the dust that could harm the crews and people nearby. This is
small issue but very important. For each demolition work, everyone must be
safe.
10. Clean, collect the mortar dust and scrap
and pile them up in order to move them and clear the area. Job done. The
demolition process may vary according to the differences of each building.
However, in general, all process can be used to study for your understanding
before you hire any demolition contractor. There are few times in your life
that you will get involved in the demolition of the building. Piyamitr group
would like you all to demolish it in order to rebuild the new things and go
well with it.