Not so many times in our lives that we would demolish our houses or our office building. It seems that the construction demolition is far from us. However, if one day, it has to be done, many people would have doubt about its process- as the hirer, what do we need to do . Piyamitr group will collect all the process of building demolition to let you see the big picture of the construction for your understanding so that once you need to do it, you will learn from it and  the work will be accomplished successfully.

1. Call for the appointment When you think about doing home demolition or building demolition, you should consult the real expert like us. Piyamitr Group Co.Ltd (more than 20 years of experience), will send the expert to the site for free, there is no charge. Just call 081 7551229 or if you would like to roughly evaluate the cost and need the urgent pricing, you can send the photos of the home, building that you would like to demolish via the Line : joethailand007. We serve you 24/7.

Do not feel shy or considerate to consult us because if you mistakenly do it, the problems may be overwhelmingly unable to be fixed. Customers frequently call us to evaluate the demolition work, in many cases that we recommend to not do the demolition at all.

2. Analyze the building
The next step is that the constructor will survey the site to analyze the building to evaluate the difficulty from the exterior of the building, for example, which part of the building that need to be demolished, which direction of the building that will be extended, in order to plan for how to demolish it, how many crews needed, what tools are required.  This way we can tell the contractor to explain the details and plan the work  together.

                      

3. Look around the area. Besides analyzing the demolished building, the next step is for the contractor to do the analysis of the environment nearby the demolished building. For example, how are the nearby buildings, how many people living around the demolished site, what are their lifestyle, in order to find the method to prevent the disturbance to the nearby buildings and people around that area. Most importantly, it's essential to the safety of everyone. This data will be used to plan the work. For each demolition, only the building that must be collapsed, but the relationship and the safety must be strengthened. Everyone smiles once the job is done.  

4. Draft the contract
Once the contractor have finished the demolition  plan, there will be the presentation of the demolition steps and accident prevention methods  to ensure the safety. There is the contract draft and the presentation of the process to the hirer to be informed  and read before the approval. If there's anything missing, we can add and tell each other at once. 

   

5. Find the auspicious time before the actual demolition. Piyamitr group have concerns in every detail. We find the auspicious day according the Fengshui in order to find the date of demolition to ensure the work is done successfully and for the propitiousness  of the hirer

 6.  Prepare the area on the auspicious date, it is time to start demolition work, the first thing that the contractor do is to prepare for the area, enclose the area, provide tools and equipments for the safety. This is very important.

 7. Meet the team before starting the demolition. The contractor will call for the meeting of the demolition crews to get the same understanding about the whole picture of the project- where and how  to demolish, what are the concerns in order to get the work done successfully and most importantly for the safety of everyone including the team and the people nearby.

8. Actual demolition The actual demolition will start from removing materials that can be reused first such as electric wires need to be removed in long continuous strings, doors, windows, and sanitary wares onto the roof tiles. Therefore, wherever these materials located in our homes, we can tell the contractor what are they and where are they in your home to make sure you remove all things that you need, nothing wasted. Once you got everything you want to keep, the demolition work can start immediately from the top of the building starting from smashing the floor, the ceiling until there's the building structure left - the poles and beams.

9.Continue demolishing the poles and beams. If it is the exterior part near the road or nearby houses, the contractor will use the wire rope pulling hoist to attach with the pole and beam to force it to fall down in one direction to ensure the safety of the demolition crew and people who live nearby. 

Once there is only internal structure left, it is time to start backhoe engine, which come with the heavy Hydraulic Breaker ready to break through the building in its full stream starting from the top to bottom of the building. This process is the process that will generate a lot of concrete dust, which is hazardous to our lives if we inhale it. In this process, we use  dust suppression sprayer fog to prevent the spreading of the dust that could harm the crews and people nearby. This is small issue but very important. For each demolition work, everyone must be safe. 

 10. Clean, collect the mortar dust and scrap and pile them up in order to move them and clear the area. Job done. The demolition process may vary according to the differences of each building. However, in general, all process can be used to study for your understanding before you hire any demolition contractor. There are few times in your life that you will get involved in the demolition of the building. Piyamitr group would like you all to demolish it in order to rebuild the new things and go well with it.