Demolition Australia Embassy previous
Demolition Australia Embassy previous
Demolition of Australia Embassy
Demolition work of Australia Embassy, the building
located at Sathorn Road, Suan Plu area. The Malaysia Embassy is on the right
and the Shell Gas station and hi-end condominium buildings are on the left,
while at the back, there is the house of one Thai millionaire..
The building had the strange inverted
pyramid shape with the height of 26 meter lift, with 5 storey on 21 meter
building (approximately), designed by Australian architectural engineer. The
upper floor can รับรแรง by large sling holding or lifting up the third floor,
which normally the อาคาร คสล in general, the lower floor steel must be more
than the upper steel resulting from holding the concrete weight but this
special building, it is the opposite. The distance space of the poles is 12
meters, with the waffle like ground beam, the floor to floor height is 5-7
meters, meaning that the design and construction of this place is
unconventional ( the demolition is unconventional) Every part of this building
is beyond normal specification from the roof, vault, the wall, and the footing.
The concrete strength is "extremely strong", it takes quite a long time to be
able to figure it out.
Last year, I had the chance to talk to a civil
engineer, he views that the demolition work is harder than the construction
task because he can't tell what to find inside the structure. This building is
really the proof of his statement.
Before Songkran day in 2018, the whole building will
be demolished with the safety for sure.
Thank you Sompor345 company for the opportunity to
join this task together.