Before getting to the highest point, we
always have to start from the first step.
As we all know, there is no demolition
or construction work without any conflict with the neightborhood, no noise, no
dust, nor any form of vibration (or there maybe all of them) we have to make it
has the least impact within shortest period of time.
For the demolition work in the community in the alley,
the first thing that has to be done is to visit and let people understand the
working method. This is very important, equally important as working with
This sample case, the owner is the demolition
contractor and the engineer use their own crew to do the demolition work by
themselves. The owner of the building used to manage and design the
construction by himself so he think that the demolition work must be easy, even
easier than doing the construction as he does not have to build it up, mixing
the plaster, so he decided to dismantle the building, manage it and submit
permission by himself.
The process started with covering the buidling with
shelter net (I don't have the photos
to illustrate it), the local people said that there were materials bounce off
the area everyday until there was the file to suspend the work for temporary.
The staff who handle the demolition task do not have the good understanding nor do they have good enough management to
handle the work, until there were argument with the local people.
Finally the problem has been escalated until they are
unable to do any more demolition work. Thus, Piyamitr group company was called
in order to help fixing the problem (they wouldn't call us to do easy task for
sure)
For this task, I would put the difficulty scale for
the concrete structure for 1 out of 5, while the problem with the neighborhoods
with the scale of 5 out of 5. The cause of this was from the bad start, they
did not introduce themselves, no announcement sign, no protection measures, no
conversation which make the problem get worse until the task was on hold and
millions baht construction project had to be on hold as well.
The conclussion of this work, I have to solve the
problem by making the demolition plan, presenting the demolition method to the
representative of the Municipality,soldiers
villagers (about 10 people), the owner's representative to hear and .to inspect inside the site before
starting the work until people are satisfied with the demolition staff for this
task to run smoothly
#รับรื้อถอน #รื้อถอน #รื้อตึก #รื้อบ้าน #ทุบตึก
#โจ้ทุบตึก #ทุบบ้าน #รื้อโรงงาน #รับเหมารื้อถอน #รับรื้อตึก #รับรื้อบ้าน
#รับทุบตึก #LowNoiseDemolition #demolition #解体作業 #解体 #解体ビル #หนีบปูน
#หนีบคอนกรีต #รื้อถอนภายใน #รื้อภายใน
www.piyamitrgroup.com
w ww.piyamitrgroup.net
Joe 0817551229